Prishtina Mall is looking for an experienced, highly qualified External Project Manager to serve as the Owner’s independent technical representative on a major rooftop Solar Photovoltaic (PV) installation project.
The assignment covers a photovoltaic power plant with an estimated installed capacity of approximately 3.0 MWp to 3.5 MWp, encompassing design, supply, installation, testing and commissioning. Throughout the project lifecycle, the professional will independently supervise technical matters, coordinate activities and monitor delivery, safeguarding the Owner’s interests and checking adherence to contractual, technical, safety, legal and operational requirements.
1. Project Context
The Owner has awarded an EPC/installation contract for the design, supply, installation, testing and commissioning of a photovoltaic power plant with an installed capacity of approximately 3.0 MWp to 3.5 MWp.
Separately, an independent Fire Safety Consultant has been appointed by the Owner to assess fire risks and establish the installation’s specific fire protection and life safety requirements.
As the Owner’s technical representative and Owner’s Engineer, the External Project Manager (PM) will oversee, coordinate, review and validate the contributions of all project stakeholders. These include the EPC Contractor, specialist companies, project offices, the Fire Safety Consultant, local authorities, utility companies, insurers and the Shopping Centre’s operational teams.
Across the full project lifecycle, the PM will protect the Owner’s interests while supporting delivery that satisfies contractual, technical, safety, legal and operational obligations.
2. Project Goals
The External Project Manager’s responsibilities will encompass:
- Acting on the Owner’s behalf in every technical and project-related matter.
- Aligning activities and interfaces among all project participants.
- Assessing and validating the EPC Contractor’s technical deliverables.
- Checking adherence to fire safety obligations and applicable legislation.
- Tracking conformity with approved project documents and every requirement in the Terms of Reference.
- Ensuring the photovoltaic installation meets the Shopping Centre’s operational and maintenance needs.
- Tracking the programme, risks, quality, and health and safety performance.
- Following up on EPC documentation and ensuring critical paperwork, insurance policies and guarantees are renewed on time.
- Documenting and tracking non-compliance and, where relevant, calculating applicable Liquidated Damages.
- Supervising testing, commissioning, handover and final acceptance activities.
- Services Covered
3.1 Design and Technical Assessment
Arrange the assessment and review of all technical documents provided by the EPC Contractor, including, without limitation, the items below:
3.1.1 Electrical Design Review
- Review single-line diagrams.
- Assess the detailed electrical design.
- Examine protection coordination studies.
- Review short-circuit studies.
- Assess load flow studies.
- Examine earthing and lightning protection systems.
- Review arc-flash assessments where applicable.
- Assess power quality studies.
- Examine grid connection documentation.
- Review energy metering and monitoring systems.
- Assess SCADA and remote monitoring architecture.
3.1.2 Structural Design Review
Organise the review and evaluation of structural documents produced by the Contractor, covering:
- Studies establishing roof load capacity.
- Calculations for structural performance.
- Calculations of wind loading.
- Seismic evaluations where applicable.
- Calculations for the mounting system.
- Methods proposed for fixings.
- Measures addressing waterproofing and roof integrity.
- Suitability for the building’s existing structures.
Whenever necessary, the PM will arrange an independent structural assessment by a qualified structural engineer.
3.1.3 Equipment Assessment
Arrange reviews of technical specifications and compliance records for the equipment and systems listed below:
- Assess PV modules.
- Review inverters.
- Examine mounting structures.
- Assess DC and AC cabling.
- Review switchgear.
- Examine protection devices.
- Assess transformers.
- Review monitoring and control systems.
- Examine safety equipment.
3.2 Fire Safety Conformity
Organise checks against the Fire Risk Assessment and every requirement defined by the Fire Safety Consultant, including:
- Requirements for fire compartmentation.
- Routes providing firefighter access.
- Required safety separation distances.
- Systems for emergency shutdown.
- Isolation switches for firefighters.
- Interfaces with smoke extraction systems.
- Requirements for signs and labels.
- Requirements governing cable routes.
- Interfaces with fire detection and alarm systems.
- Requirements specified by insurers.
3.3 Assistance with Procurement
At the Owner’s request, assist with procurement activities by:
- Finding suitably qualified potential vendors and specialist companies for individual disciplines.
- Addressing bidders’ technical queries together with the Owner and relevant stakeholders.
- Undertaking or assisting with technical assessments of submitted offers.
For every procurement exercise, provide the Owner with a concise assessment and recommendation that identifies the preferred bidder(s) and outlines significant risks, gaps or other relevant considerations.
3.4 Regulatory and Legal Conformity
Track and assist adherence to all relevant regulations and permit obligations, covering:
- Regulations governing buildings and construction.
- Rules applicable to electrical works.
- Regulations concerning renewable energy.
- Conditions for grid connection.
- Requirements for occupational health and safety.
- Regulations governing fire safety.
- Obligations relating to the environment.
- Requirements imposed by utilities and network operators.
Determine which permits, approvals and notifications the project requires, and track their completion to ensure they are obtained or made on time.
3.5 Project and Stakeholder Coordination
Serve as the main coordination contact among these parties:
- Coordinate with the EPC Contractor.
- Liaise with specialist companies.
- Coordinate with project offices.
- Liaise with the Fire Safety Consultant.
- Coordinate with Shopping Centre Management.
- Liaise with Operations and Maintenance Teams.
- Coordinate with the Utility / Distribution Network Operator.
- Liaise with insurance representatives.
- Coordinate with Authorities Having Jurisdiction (AHJ).
The coordination remit includes:
- Arranging and leading coordination meetings.
- Preparing and distributing meeting minutes.
- Overseeing communications concerning the project.
- Aligning technical interfaces.
- Raising critical matters for escalation.
- Following the implementation of action plans and agreed follow-up measures.
3.6 Programme and Progress Tracking
Assess and track these aspects of project planning and progress:
- The schedule forming the baseline.
- The programme detailing execution.
- The timetable for procurement.
- Activities on the critical path.
- The project’s principal milestones.
The PM’s duties include:
- Detecting delays and risks affecting execution.
- Evaluating proposed mitigation measures.
- Tracking programmes intended to recover delays.
- Informing the Owner about programme performance and significant deviations.
3.7 Oversight of Construction
Arrange technical supervision throughout construction to support conformity with approved designs and contractual obligations.
This work encompasses:
- Conducting routine site inspections.
- Carrying out audits of quality.
- Reviewing conformity with technical requirements.
- Checking the installation methods used.
- Tracking the standard of workmanship.
- Assessing the Contractor’s performance.
Particular focus will be placed on:
- Work carried out on the roof.
- Installation of structural elements.
- The integrity of waterproofing measures.
- Installation of electrical systems.
- Connections and interfaces with existing operational systems.
- Measures providing fire protection.
3.8 Health, Safety and Environmental Supervision
Track how the Contractor implements health, safety and environmental (HSE) requirements.
Assess and review the following documentation and procedures:
- Examine the Construction Phase Safety Plan.
- Review Method Statements.
- Assess Risk Assessments.
- Examine Emergency Response Plans.
- Review Rescue Plans.
- Assess procedures for working at height.
- Examine Lock-Out/Tag-Out procedures.
- Review plans for lifting operations.
- Assess plans for managing traffic.
Particular care must be taken to preserve a safe environment in the operating shopping centre, recognising the presence of employees, tenants, visitors, contractors and other people using the site.
3.9 Management of Risks
Create and keep the Project Risk Register up to date, addressing at least the following risk categories and individual risks:
Technical Risk Areas
- Overloading of structural elements.
- Damage affecting the roof.
- Failure of waterproofing measures.
- Faults within electrical systems.
- Hazards arising from arc-flash.
- Failure of equipment.
Operational Risk Areas
- Interruption of business activities.
- Loss of electricity supply.
- Limitations on access to technical plant.
- Restrictions affecting maintenance.
Safety Risk Areas
- Fire hazards.
- Exposure to electric shock.
- Objects falling from height.
- Incidents occurring during work at height.
Regulatory Risk Areas
- Delays in obtaining permits.
- Failure to meet compliance obligations.
- Risks associated with utility approvals.
The PM will recommend suitable mitigation measures, allocate or propose follow-up actions as appropriate, and track their execution.
3.10 Management of Changes
Evaluate every change proposed by the Contractor.
Where relevant, each proposal must be considered against the following factors:
- Its technical consequences.
- Its implications for safety.
- Its implications for fire safety.
- Its effect on costs.
- Its effect on the programme.
- Its effect on operations.
Submit recommendations to the Owner before approval is given to any proposed change.
3.11 Testing and Commissioning Oversight
Assess and attend the following activities to witness their execution, where applicable:
- Inspections preceding commissioning.
- Tests of equipment.
- Tests of protection systems.
- Tests of functionality.
- Tests of SCADA and monitoring systems.
- Tests of emergency shutdown arrangements.
- Tests of utility interconnection.
- Tests of performance.
Assess the Commissioning Plan and related procedures, supplying the necessary technical review and recommendations.
3.12 Handover and Provisional Acceptance Support
Assist the Owner during handover through:
- Compiling lists of outstanding items.
- Recording non-conformities.
- Checking that corrective measures have been taken.
- Assessing completion records.
- Advising Provisional Acceptance once the relevant requirements are satisfied.
3.13 Final Acceptance Verification
Confirm the following conditions:
- Every punch-list item has been resolved.
- The required performance levels have been attained.
- All required documentation has been supplied.
- The necessary training has been completed.
- The Owner has received the transferred warranties.
After these checks, submit a recommendation to the Owner concerning Final Acceptance.
3.14 Review and Transfer of Documentation
Assess and validate the completed project documentation, including, without limitation:
Technical Records
- Drawings showing the as-built installation.
- Calculations updated to reflect the final project.
- Settings for protection systems.
- Diagrams in single-line form.
- Registers listing equipment.
Operational Records
- Manuals for O&M.
- Schedules covering preventive maintenance.
- Recommendations for spare parts stock.
- Procedures for emergencies.
Compliance Records
- Certificates documenting inspections.
- Approvals from regulatory bodies.
- Certificates confirming fire safety compliance.
- Reports documenting commissioning.
- Reports recording performance tests.
Commercial Records
- Warranties covering equipment.
- Warranties covering installation.
- Guarantees relating to performance.
4. Required Deliverables
At a minimum, the External Project Manager must supply the following outputs:
- Prepare the Initial Design Review Report.
- Produce Monthly Progress Reports.
- Provide Monthly Risk Register Updates.
- Prepare Meeting Minutes.
- Produce Site Visit Reports.
- Prepare Technical Review Reports.
- Provide Fire Safety Compliance Reviews.
- Complete Change Request Assessments.
- Prepare the Commissioning Review Report.
- Produce the Provisional Acceptance Report.
- Prepare the Final Acceptance Report.
- Produce the Final Project Close-Out Report.
5. Minimum Qualifications and Experience
Candidates must satisfy these minimum criteria:
- Hold a university degree in Electrical, Energy or Mechanical Engineering.
- Have at least 10 years of project management experience involving solar energy projects.
- Have managed at least one solar PV project rated at 1 MWp or more during the last three years.
- Have managed at least one rooftop solar PV installation rated at 1 MWp or more.
Candidates should substantiate their relevant experience with a clear record of completed or ongoing assignments, specifying project capacities, dates and their own responsibilities.
6. Engagement Terms and Duration
- The contract will take the form of a Service Agreement – Independent External Professional.
- The assignment consists of fixed-term, project-based professional services.
- The estimated duration is 30–35 weeks, depending on actual project completion, continuing until mechanical completion and successful completion of the PV system’s commissioning test.
- The work location is Prishtina Mall, Prishtina, Kosovo.
- The appointed professional will independently represent the Owner on technical matters, remaining outside Prishtina Mall’s internal organisational structure and normal hierarchical reporting arrangements.
The arrangement is for independent professional services rather than an employment relationship with Prishtina Mall.
7. Required Documents
- A current Curriculum Vitae (CV).
- Copies of academic qualifications and applicable professional certifications.
- A record of relevant solar PV projects stating project capacity (MWp), project dates and the candidate’s responsibilities.
- Evidence demonstrating experience with rooftop solar PV installations rated at least 1 MWp.
- Professional references where available.
- A proposed professional fee covering the full scope of services, specifying the proposed payment structure and any additional costs.
Prishtina Mall is looking for an experienced, highly qualified External Project Manager to serve as the Owner’s independent technical representative on a major rooftop Solar Photovoltaic (PV) installation project.
The assignment covers a photovoltaic power plant with an estimated installed capacity of approximately 3.0 MWp to 3.5 MWp, encompassing design, supply, installation, testing and commissioning. Throughout the project lifecycle, the professional will independently supervise technical matters, coordinate activities and monitor delivery, safeguarding the Owner’s interests and checking adherence to contractual, technical, safety, legal and operational requirements.
1. Project Context
The Owner has awarded an EPC/installation contract for the design, supply, installation, testing and commissioning of a photovoltaic power plant with an installed capacity of approximately 3.0 MWp to 3.5 MWp.
Separately, an independent Fire Safety Consultant has been appointed by the Owner to assess fire risks and establish the installation’s specific fire protection and life safety requirements.
As the Owner’s technical representative and Owner’s Engineer, the External Project Manager (PM) will oversee, coordinate, review and validate the contributions of all project stakeholders. These include the EPC Contractor, specialist companies, project offices, the Fire Safety Consultant, local authorities, utility companies, insurers and the Shopping Centre’s operational teams.
Across the full project lifecycle, the PM will protect the Owner’s interests while supporting delivery that satisfies contractual, technical, safety, legal and operational obligations.
2. Project Goals
The External Project Manager’s responsibilities will encompass:
- Acting on the Owner’s behalf in every technical and project-related matter.
- Aligning activities and interfaces among all project participants.
- Assessing and validating the EPC Contractor’s technical deliverables.
- Checking adherence to fire safety obligations and applicable legislation.
- Tracking conformity with approved project documents and every requirement in the Terms of Reference.
- Ensuring the photovoltaic installation meets the Shopping Centre’s operational and maintenance needs.
- Tracking the programme, risks, quality, and health and safety performance.
- Following up on EPC documentation and ensuring critical paperwork, insurance policies and guarantees are renewed on time.
- Documenting and tracking non-compliance and, where relevant, calculating applicable Liquidated Damages.
- Supervising testing, commissioning, handover and final acceptance activities.
- Services Covered
3.1 Design and Technical Assessment
Arrange the assessment and review of all technical documents provided by the EPC Contractor, including, without limitation, the items below:
3.1.1 Electrical Design Review
- Review single-line diagrams.
- Assess the detailed electrical design.
- Examine protection coordination studies.
- Review short-circuit studies.
- Assess load flow studies.
- Examine earthing and lightning protection systems.
- Review arc-flash assessments where applicable.
- Assess power quality studies.
- Examine grid connection documentation.
- Review energy metering and monitoring systems.
- Assess SCADA and remote monitoring architecture.
3.1.2 Structural Design Review
Organise the review and evaluation of structural documents produced by the Contractor, covering:
- Studies establishing roof load capacity.
- Calculations for structural performance.
- Calculations of wind loading.
- Seismic evaluations where applicable.
- Calculations for the mounting system.
- Methods proposed for fixings.
- Measures addressing waterproofing and roof integrity.
- Suitability for the building’s existing structures.
Whenever necessary, the PM will arrange an independent structural assessment by a qualified structural engineer.
3.1.3 Equipment Assessment
Arrange reviews of technical specifications and compliance records for the equipment and systems listed below:
- Assess PV modules.
- Review inverters.
- Examine mounting structures.
- Assess DC and AC cabling.
- Review switchgear.
- Examine protection devices.
- Assess transformers.
- Review monitoring and control systems.
- Examine safety equipment.
3.2 Fire Safety Conformity
Organise checks against the Fire Risk Assessment and every requirement defined by the Fire Safety Consultant, including:
- Requirements for fire compartmentation.
- Routes providing firefighter access.
- Required safety separation distances.
- Systems for emergency shutdown.
- Isolation switches for firefighters.
- Interfaces with smoke extraction systems.
- Requirements for signs and labels.
- Requirements governing cable routes.
- Interfaces with fire detection and alarm systems.
- Requirements specified by insurers.
3.3 Assistance with Procurement
At the Owner’s request, assist with procurement activities by:
- Finding suitably qualified potential vendors and specialist companies for individual disciplines.
- Addressing bidders’ technical queries together with the Owner and relevant stakeholders.
- Undertaking or assisting with technical assessments of submitted offers.
For every procurement exercise, provide the Owner with a concise assessment and recommendation that identifies the preferred bidder(s) and outlines significant risks, gaps or other relevant considerations.
3.4 Regulatory and Legal Conformity
Track and assist adherence to all relevant regulations and permit obligations, covering:
- Regulations governing buildings and construction.
- Rules applicable to electrical works.
- Regulations concerning renewable energy.
- Conditions for grid connection.
- Requirements for occupational health and safety.
- Regulations governing fire safety.
- Obligations relating to the environment.
- Requirements imposed by utilities and network operators.
Determine which permits, approvals and notifications the project requires, and track their completion to ensure they are obtained or made on time.
3.5 Project and Stakeholder Coordination
Serve as the main coordination contact among these parties:
- Coordinate with the EPC Contractor.
- Liaise with specialist companies.
- Coordinate with project offices.
- Liaise with the Fire Safety Consultant.
- Coordinate with Shopping Centre Management.
- Liaise with Operations and Maintenance Teams.
- Coordinate with the Utility / Distribution Network Operator.
- Liaise with insurance representatives.
- Coordinate with Authorities Having Jurisdiction (AHJ).
The coordination remit includes:
- Arranging and leading coordination meetings.
- Preparing and distributing meeting minutes.
- Overseeing communications concerning the project.
- Aligning technical interfaces.
- Raising critical matters for escalation.
- Following the implementation of action plans and agreed follow-up measures.
3.6 Programme and Progress Tracking
Assess and track these aspects of project planning and progress:
- The schedule forming the baseline.
- The programme detailing execution.
- The timetable for procurement.
- Activities on the critical path.
- The project’s principal milestones.
The PM’s duties include:
- Detecting delays and risks affecting execution.
- Evaluating proposed mitigation measures.
- Tracking programmes intended to recover delays.
- Informing the Owner about programme performance and significant deviations.
3.7 Oversight of Construction
Arrange technical supervision throughout construction to support conformity with approved designs and contractual obligations.
This work encompasses:
- Conducting routine site inspections.
- Carrying out audits of quality.
- Reviewing conformity with technical requirements.
- Checking the installation methods used.
- Tracking the standard of workmanship.
- Assessing the Contractor’s performance.
Particular focus will be placed on:
- Work carried out on the roof.
- Installation of structural elements.
- The integrity of waterproofing measures.
- Installation of electrical systems.
- Connections and interfaces with existing operational systems.
- Measures providing fire protection.
3.8 Health, Safety and Environmental Supervision
Track how the Contractor implements health, safety and environmental (HSE) requirements.
Assess and review the following documentation and procedures:
- Examine the Construction Phase Safety Plan.
- Review Method Statements.
- Assess Risk Assessments.
- Examine Emergency Response Plans.
- Review Rescue Plans.
- Assess procedures for working at height.
- Examine Lock-Out/Tag-Out procedures.
- Review plans for lifting operations.
- Assess plans for managing traffic.
Particular care must be taken to preserve a safe environment in the operating shopping centre, recognising the presence of employees, tenants, visitors, contractors and other people using the site.
3.9 Management of Risks
Create and keep the Project Risk Register up to date, addressing at least the following risk categories and individual risks:
Technical Risk Areas
- Overloading of structural elements.
- Damage affecting the roof.
- Failure of waterproofing measures.
- Faults within electrical systems.
- Hazards arising from arc-flash.
- Failure of equipment.
Operational Risk Areas
- Interruption of business activities.
- Loss of electricity supply.
- Limitations on access to technical plant.
- Restrictions affecting maintenance.
Safety Risk Areas
- Fire hazards.
- Exposure to electric shock.
- Objects falling from height.
- Incidents occurring during work at height.
Regulatory Risk Areas
- Delays in obtaining permits.
- Failure to meet compliance obligations.
- Risks associated with utility approvals.
The PM will recommend suitable mitigation measures, allocate or propose follow-up actions as appropriate, and track their execution.
3.10 Management of Changes
Evaluate every change proposed by the Contractor.
Where relevant, each proposal must be considered against the following factors:
- Its technical consequences.
- Its implications for safety.
- Its implications for fire safety.
- Its effect on costs.
- Its effect on the programme.
- Its effect on operations.
Submit recommendations to the Owner before approval is given to any proposed change.
3.11 Testing and Commissioning Oversight
Assess and attend the following activities to witness their execution, where applicable:
- Inspections preceding commissioning.
- Tests of equipment.
- Tests of protection systems.
- Tests of functionality.
- Tests of SCADA and monitoring systems.
- Tests of emergency shutdown arrangements.
- Tests of utility interconnection.
- Tests of performance.
Assess the Commissioning Plan and related procedures, supplying the necessary technical review and recommendations.
3.12 Handover and Provisional Acceptance Support
Assist the Owner during handover through:
- Compiling lists of outstanding items.
- Recording non-conformities.
- Checking that corrective measures have been taken.
- Assessing completion records.
- Advising Provisional Acceptance once the relevant requirements are satisfied.
3.13 Final Acceptance Verification
Confirm the following conditions:
- Every punch-list item has been resolved.
- The required performance levels have been attained.
- All required documentation has been supplied.
- The necessary training has been completed.
- The Owner has received the transferred warranties.
After these checks, submit a recommendation to the Owner concerning Final Acceptance.
3.14 Review and Transfer of Documentation
Assess and validate the completed project documentation, including, without limitation:
Technical Records
- Drawings showing the as-built installation.
- Calculations updated to reflect the final project.
- Settings for protection systems.
- Diagrams in single-line form.
- Registers listing equipment.
Operational Records
- Manuals for O&M.
- Schedules covering preventive maintenance.
- Recommendations for spare parts stock.
- Procedures for emergencies.
Compliance Records
- Certificates documenting inspections.
- Approvals from regulatory bodies.
- Certificates confirming fire safety compliance.
- Reports documenting commissioning.
- Reports recording performance tests.
Commercial Records
- Warranties covering equipment.
- Warranties covering installation.
- Guarantees relating to performance.
4. Required Deliverables
At a minimum, the External Project Manager must supply the following outputs:
- Prepare the Initial Design Review Report.
- Produce Monthly Progress Reports.
- Provide Monthly Risk Register Updates.
- Prepare Meeting Minutes.
- Produce Site Visit Reports.
- Prepare Technical Review Reports.
- Provide Fire Safety Compliance Reviews.
- Complete Change Request Assessments.
- Prepare the Commissioning Review Report.
- Produce the Provisional Acceptance Report.
- Prepare the Final Acceptance Report.
- Produce the Final Project Close-Out Report.
5. Minimum Qualifications and Experience
Candidates must satisfy these minimum criteria:
- Hold a university degree in Electrical, Energy or Mechanical Engineering.
- Have at least 10 years of project management experience involving solar energy projects.
- Have managed at least one solar PV project rated at 1 MWp or more during the last three years.
- Have managed at least one rooftop solar PV installation rated at 1 MWp or more.
Candidates should substantiate their relevant experience with a clear record of completed or ongoing assignments, specifying project capacities, dates and their own responsibilities.
6. Engagement Terms and Duration
- The contract will take the form of a Service Agreement – Independent External Professional.
- The assignment consists of fixed-term, project-based professional services.
- The estimated duration is 30–35 weeks, depending on actual project completion, continuing until mechanical completion and successful completion of the PV system’s commissioning test.
- The work location is Prishtina Mall, Prishtina, Kosovo.
- The appointed professional will independently represent the Owner on technical matters, remaining outside Prishtina Mall’s internal organisational structure and normal hierarchical reporting arrangements.
The arrangement is for independent professional services rather than an employment relationship with Prishtina Mall.
7. Required Documents
- A current Curriculum Vitae (CV).
- Copies of academic qualifications and applicable professional certifications.
- A record of relevant solar PV projects stating project capacity (MWp), project dates and the candidate’s responsibilities.
- Evidence demonstrating experience with rooftop solar PV installations rated at least 1 MWp.
- Professional references where available.
- A proposed professional fee covering the full scope of services, specifying the proposed payment structure and any additional costs.